In 2000, EPG took the guide in gaining ISO14001 atmosphere management certificate and thereafter passed the inspection of clean production and recycling economic climate, profitable the title of “Zhejiang Inexperienced Enterprise”.
Overview
Quick Specifics
- Applicable Industries:
-
Resorts, Garment Shops, Building Materials Retailers, Manufacturing Plant, Machinery Repair Outlets, Foods & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Store, Printing Retailers, Design works , Power & Mining, Food & Beverage Retailers, Marketing Organization
- Material:
-
Metal
- Regular:
-
ISO
- Spot of Origin:Zhejiang, China
- Brand name Identify:
-
OEM
- Item identify:
-
Manufacturing unit immediate high good quality modest spur gear
- Certification:
-
ISO9001
- Content Select:
-
C45
- Colour:
-
Mother nature
- Packing:
-
Plywood Box
- OEM:
-
Help
Offer Capacity
- Provide Potential:
- 10000000 Device/Models per Month
Packaging & Supply
- Packaging Details
- plastic bag+plywood box+according to customers’ specifications
- Port
- HangZhou Or Ningbo
- Picture Case in point:
-
Lead Time
: -
Amount(Units) one – a thousand >1000 Est. Time(days) 45 To be negotiated
On the internet Customization
Movie Description
1 | Materials |
C45(one.0503),SS304(one.4517),SS316(1.4541),Q235(S235JR),Q345,C20,40Cr,POM,PA6,Aluminum,GG25, Qt900-two,qt600-3,qt800-two,qt500-seven,9cr18mov,qt400-fifteen,20CRMNTI,42CRMO,Brass(Copper) —SPROCKETS/GEARS/CNC MACHINING Parts/BUSHINGS/SHAFTS/PULLEYS/COUPLINGS
|
2 | Tailored |
Drawing as normal or approved by shopper ahead of creation |
three | Common |
ANSI ,ASA,DIN ,JIS ,BS, ( SATI, CHIARAVALLI, BEA,MARTIN, BROWNING,KANA) |
4 | Warmth Treatment |
Harden enamel, Carburizing and Quenching,Gas Nitriding |
five | Suface Remedy |
Black Oxide, Black phosphating, Nickel plating,Chromium plating,Copper Passivation |
six |
Approach
|
Forging( casting)—lathe- enamel shaping—finishing—oil washing—Packing ,produced by CNC machine |
seven | Inspection |
All objects are checked and analyzed totally in the course of each working procedure and soon after the item is ultimately manufactured to ensure that the ideal high quality item enter into the industry.
|
eight | Perform |
Resilient, bad issue Resistance |
nine | Delivery Time | In inventory or about thirty-fifty Times days |